Engineering case

ENGINEERING CASE

Hangzhou Kangqiao Road to Shangtang Road node lifting project (main line) steel box girder project

       This section is for the lifting of Kangqiao Road to Shangtang Road nodeJourney: Ground road from the south to the hook Yun Road, north to Xuanhang railwayOn the south side, the design starting point pile number K0+013.732, finish pileNumber K2+170 total length 2156.268KM, elevated south from Yu HouseRoad (Wangjiaqiao Road), starting pile number K0+423.8,The viaduct extends north to K1+998.25, elevated full line length1.58KM。
       The steel box girder part is 6000 tons, the largest span度60米。

Scan and follow the wechat public platform

Technical support:Wanqi network

Copyright ©2019 Zhejiang Jushi Bridge Steel Structure Co., LTD. All Rights Reserved. Zhejiang ICP No. 2023008720-1